Airport-to-resort transfer times: 69 ski areas compared

Seven of the 69 ski areas SkiDomain covers are under 90 minutes from landing to the village, all of them in North America. In Europe, fourteen of the 46 areas are within two hours: eight from the regional airports Innsbruck, Salzburg and Turin and six from Geneva; none of the routes timed from Zurich or Milan is under 2 h 30.

Published 3 October 2026 · SkiDomain research · 69 ski areas, figures checked 2 and 3 October 2026
Research by , Expeditioner Travel · How SkiDomain scores
Key findings

Flying into…

Choose the airport and read its areas by estimated time from landing to the village; a hollow dot is a village timed on its own. Shortlist by the transfer you will accept, then weigh the flight connections to that airport, the means (road or rail) and the village itself; the matcher applies your own limit to the same figures.

Geneva (GVA), Switzerland: 14 areas, 1 h 45 to 3 h 40; 6 within two hours of landing.

  • 1 h 45 Aravis (La Clusaz – Le Grand-Bornand) to La Clusaz, France · road · medium confidence
  • 1 h 45 Évasion Mont-Blanc / Megève to Megève, France · road · high confidence
  • 1 h 55 Chamonix Mont-Blanc Valley to Chamonix Centre, France · road · high confidence
  • 2 h Courmayeur Mont Blanc to Courmayeur, Italy · road · high confidence
  • 2 h Grand Massif to Flaine, France · road · high confidence
  • 2 h Portes du Soleil to Morzine, France · road · high confidence
  • 2 h 30 Verbier 4 Vallées to Verbier, Switzerland · road · high confidence
  • 2 h 35 Valmorel – Grand Domaine to Valmorel, France · road · high confidence
  • 2 h 50 Crans-Montana to Crans, Switzerland · road · high confidence
  • 3 h Les 3 Vallées to Courchevel 1850, France · road · high confidence
  • 3 h 15 Paradiski to Arc 1950, France · road · low confidence
  • 3 h 25 Alpe d'Huez Grand Domaine to Alpe d'Huez, France · road · medium confidence
  • 3 h 30 Tignes–Val d'Isère to Val d'Isère, France · road · high confidence
  • 3 h 40 Les Deux Alpes to Les Deux Alpes, France · road · high confidence
  • 2 h Champéry a village of Portes du Soleil, Switzerland, timed on its own · road · medium confidence
  • 3 h 30 La Rosière a village of Espace San Bernardo (La Thuile – La Rosière), France, timed on its own · road · medium confidence
Map: the 69 ski areas and the airport the matcher plans each from, with the landing-to-village transfer band Each line joins a ski area to its planning airport. Colour, by the planning estimate from landing to the village: Under 90 min; 90 min to under 2 h 30; 2 h 30 to under 3 h 30; 3 h 30 or more. Dashed lines are rail. The figures are in the tables on this page. Where the 69 ski areas sit against the airport the matcher plans from Planning estimate from landing to the village by the usual means: 30 minutes after landing plus the published journey. Each line joins a ski area to the airport the matcher plans it from; the colour is the transfer band. Lines are joins, not routes. Under 90 min 90 min to under 2 h 30 2 h 30 to under 3 h 30 3 h 30 or more road rail airport the matcher plans from Each panel at its own scale (100 km bar). Village exceptions (ten villages planned from another airport) are in the table, not drawn. Scandinavia, the Pyrenees and Japan North America FRANCE SWITZERLAND ITALY AUSTRIA GERMANY The Alps 100 km Geneva (GVA) Geneva (GVA) Innsbruck (INN) Innsbruck (INN) Milan (MXP) Milan (MXP) Salzburg (SZG) Salzburg (SZG) Turin (TRN) Turin (TRN) Venice (VCE) Venice (VCE) Zurich (ZRH) Zurich (ZRH) Chamonix Mont-Blanc Valley: 1 h 55 from landing to the village, from Geneva (GVA), by road (high confidence) Chamonix · 1 h 55 Skicircus Saalbach Hinterglemm Leogang Fieberbrunn: 2 h from landing to the village, from Salzburg (SZG), by road (high confidence) Saalbach · 2 h Évasion Mont-Blanc / Megève: 1 h 45 from landing to the village, from Geneva (GVA), by road (high confidence) Megève · 1 h 45 Grand Massif: 2 h from landing to the village, from Geneva (GVA), by road (high confidence) Grand Massif · 2 h KitzSki: 1 h 55 from landing to the village, from Innsbruck (INN), by road (high confidence) Kitzbühel · 1 h 55 SkiWelt Wilder Kaiser–Brixental: 1 h 35 from landing to the village, from Innsbruck (INN), by road (high confidence) SkiWelt · 1 h 35 Courmayeur Mont Blanc: 2 h from landing to the village, from Geneva (GVA), by road (high confidence) Courmayeur · 2 h Aravis (La Clusaz – Le Grand-Bornand): 1 h 45 from landing to the village, from Geneva (GVA), by road (medium confidence) La Clusaz · 1 h 45 Les 3 Vallées: 3 h from landing to the village, from Geneva (GVA), by road (high confidence) Les 3 Vallées · 3 h Tignes–Val d'Isère: 3 h 30 from landing to the village, from Geneva (GVA), by road (high confidence) Tignes–Val d'Isère · 3 h 30 Paradiski: 3 h 15 from landing to the village, from Geneva (GVA), by road (low confidence) Paradiski · 3 h 15 Serre Chevalier: 2 h 25 from landing to the village, from Turin (TRN), by road (high confidence) Serre Chevalier · 2 h 25 Engadin St. Moritz: 4 h from landing to the village, from Zurich (ZRH), by rail (high confidence) St. Moritz · 4 h Davos Klosters: 3 h 15 from landing to the village, from Zurich (ZRH), by rail (high confidence) Davos Klosters · 3 h 15 Arosa Lenzerheide: 3 h 25 from landing to the village, from Zurich (ZRH), by rail (high confidence) Arosa Lenzerheide · 3 h 25 Ski Arlberg: 2 h 05 from landing to the village, from Innsbruck (INN), by road (high confidence) Ski Arlberg · 2 h 05 Sölden: 1 h 45 from landing to the village, from Innsbruck (INN), by road (high confidence) Sölden · 1 h 45 Obergurgl–Hochgurgl: 2 h 10 from landing to the village, from Innsbruck (INN), by road (high confidence) Obergurgl · 2 h 10 Zell am See–Kaprun: 1 h 55 from landing to the village, from Salzburg (SZG), by road (high confidence) Zell am See · 1 h 55 Sella Ronda / Dolomiti Superski core: 3 h 10 from landing to the village, from Venice (VCE), by road (high confidence) Sella Ronda · 3 h 10 Cortina d'Ampezzo: 2 h 35 from landing to the village, from Venice (VCE), by road (high confidence) Cortina · 2 h 35 Livigno: 4 h 30 from landing to the village, from Milan (MXP), by road (medium confidence) Livigno · 4 h 30 Via Lattea: 2 h from landing to the village, from Turin (TRN), by road (high confidence) Via Lattea · 2 h Espace San Bernardo (La Thuile – La Rosière): 2 h 40 from landing to the village, from Turin (TRN), by road (medium confidence) La Thuile · 2 h 40 Silvretta Montafon: 2 h 40 from landing to the village, from Zurich (ZRH), by road (medium confidence) Silvretta Montafon · 2 h 40 Alpe d'Huez Grand Domaine: 3 h 25 from landing to the village, from Geneva (GVA), by road (medium confidence) Alpe d'Huez · 3 h 25 Les Deux Alpes: 3 h 40 from landing to the village, from Geneva (GVA), by road (high confidence) Les Deux Alpes · 3 h 40 Valmorel – Grand Domaine: 2 h 35 from landing to the village, from Geneva (GVA), by road (high confidence) Valmorel · 2 h 35 Portes du Soleil: 2 h from landing to the village, from Geneva (GVA), by road (high confidence) Portes du Soleil · 2 h Matterhorn Ski Paradise: 4 h from landing to the village, from Zurich (ZRH), by rail (high confidence) Zermatt · 4 h Verbier 4 Vallées: 2 h 30 from landing to the village, from Geneva (GVA), by road (high confidence) Verbier · 2 h 30 Andermatt–Sedrun–Disentis: 2 h 45 from landing to the village, from Zurich (ZRH), by rail (high confidence) Andermatt · 2 h 45 Crans-Montana: 2 h 50 from landing to the village, from Geneva (GVA), by road (high confidence) Crans-Montana · 2 h 50 Jungfrau Ski Region: 3 h 25 from landing to the village, from Zurich (ZRH), by rail (medium confidence) Jungfrau · 3 h 25 LAAX: 2 h 30 from landing to the village, from Zurich (ZRH), by road (high confidence) LAAX · 2 h 30 Ischgl–Samnaun: 1 h 55 from landing to the village, from Innsbruck (INN), by road (high confidence) Ischgl · 1 h 55 Zillertal: 1 h 35 from landing to the village, from Innsbruck (INN), by road (high confidence) Zillertal · 1 h 35 Monterosa Ski: 2 h 30 from landing to the village, from Milan (MXP), by road (high confidence) Monterosa · 2 h 30 Skirama Dolomiti Adamello Brenta: 4 h from landing to the village, from Milan (MXP), by road (high confidence) Madonna di Campiglio · 4 h Engelberg-Titlis: 2 h 35 from landing to the village, from Zurich (ZRH), by rail (high confidence) Engelberg · 2 h 35 Risoul – Vars (Forêt Blanche): 3 h 15 from landing to the village, from Marseille (MRS), by road (medium confidence) Risoul–Vars · 3 h 15 to Marseille (MRS) NORWAY SWEDEN Norway and Sweden 100 km Stockholm (ARN) Stockholm (ARN) Oslo (OSL) Oslo (OSL) Åre: 7 h 40 from landing to the village, from Stockholm (ARN), by rail (medium confidence) Åre · 7 h 40 Hemsedal: 3 h 55 from landing to the village, from Oslo (OSL), by road (medium confidence) Hemsedal · 3 h 55 Trysil: 2 h 55 from landing to the village, from Oslo (OSL), by road (medium confidence) Trysil · 2 h 55 Hafjell: 2 h 35 from landing to the village, from Oslo (OSL), by rail (medium confidence) Hafjell · 2 h 35 SPAIN FRANCE The Pyrenees 100 km Barcelona (BCN) Barcelona (BCN) Grandvalira Resorts: 3 h 30 from landing to the village, from Barcelona (BCN), by road (medium confidence) Grandvalira · 3 h 30 HOKKAIDO Hokkaido 100 km Sapporo (CTS) Sapporo (CTS) Niseko United: 3 h 05 from landing to the village, from Sapporo (CTS), by road (high confidence) Niseko · 3 h 05 Rusutsu: 2 h 25 from landing to the village, from Sapporo (CTS), by road (high confidence) Rusutsu · 2 h 25 Kiroro: 1 h 30 from landing to the village, from Sapporo (CTS), by road (high confidence) Kiroro · 1 h 30 Furano: 2 h 50 from landing to the village, from Sapporo (CTS), by road (high confidence) Furano · 2 h 50 Hoshino Resorts Tomamu: 2 h 05 from landing to the village, from Sapporo (CTS), by rail (high confidence) Tomamu · 2 h 05 JAPAN Nagano, from Tokyo 100 km Tokyo Haneda (HND) Tokyo Haneda (HND) Nozawa Onsen: 3 h 40 from landing to the village, from Tokyo Haneda (HND), by road and rail (medium confidence) Nozawa Onsen · 3 h 40 Hakuba Valley: 4 h 10 from landing to the village, from Tokyo Haneda (HND), by road and rail (medium confidence) Hakuba · 4 h 10 Shiga Kogen: 4 h 55 from landing to the village, from Tokyo Haneda (HND), by road and rail (medium confidence) Shiga Kogen · 4 h 55 Colorado and Utah: next panel CANADA UNITED STATES Western North America 100 km Bishop (BIH) Bishop (BIH) Bozeman (BZN) Bozeman (BZN) Jackson Hole (JAC) Jackson Hole (JAC) Reno (RNO) Reno (RNO) Kelowna (YLW) Kelowna (YLW) Vancouver (YVR) Vancouver (YVR) Calgary (YYC) Calgary (YYC) SkiBig3: 2 h 15 from landing to the village, from Calgary (YYC), by road (medium confidence) Banff (SkiBig3) · 2 h 15 Revelstoke Mountain Resort: 3 h from landing to the village, from Kelowna (YLW), by road (high confidence) Revelstoke · 3 h Jackson Hole: 1 h 05 from landing to the village, from Jackson Hole (JAC), by road (high confidence) Jackson Hole · 1 h 05 Big Sky: 1 h 45 from landing to the village, from Bozeman Yellowstone (BZN), by road (medium confidence) Big Sky · 1 h 45 Palisades Tahoe: 1 h 30 from landing to the village, from Reno-Tahoe (RNO), by road (medium confidence) Palisades Tahoe · 1 h 30 Mammoth Mountain: 1 h 30 from landing to the village, from Bishop (BIH), by road (medium confidence) Mammoth · 1 h 30 Whistler Blackcomb: 3 h from landing to the village, from Vancouver (YVR), by road (medium confidence) Whistler · 3 h UTAH COLORADO WYOMING Colorado and Utah 100 km Aspen (ASE) Aspen (ASE) Denver (DEN) Denver (DEN) Eagle County (EGE) Eagle County (EGE) Hayden (HDN) Hayden (HDN) Salt Lake City (SLC) Salt Lake City (SLC) Vail: 1 h 20 from landing to the village, from Eagle County (EGE), by road (high confidence) Vail · 1 h 20 Beaver Creek: 1 h from landing to the village, from Eagle County (EGE), by road (high confidence) Beaver Creek · 1 h Breckenridge: 2 h 30 from landing to the village, from Denver (DEN), by road (medium confidence) Breckenridge · 2 h 30 Park City Mountain: 1 h 10 from landing to the village, from Salt Lake City (SLC), by road (high confidence) Park City · 1 h 10 Deer Valley: 1 h 15 from landing to the village, from Salt Lake City (SLC), by road (high confidence) Deer Valley · 1 h 15 Aspen Snowmass: 40 min from landing to the village, from Aspen/Pitkin County (ASE), by road (high confidence) Aspen Snowmass · 40 min Steamboat: 1 h 05 from landing to the village, from Yampa Valley / Hayden (HDN), by road (high confidence) Steamboat · 1 h 05 QUEBEC Quebec 100 km Montreal (YUL) Montreal (YUL) Tremblant: 2 h 15 from landing to the village, from Montreal-Trudeau (YUL), by road (high confidence) Tremblant · 2 h 15 Positions: © OpenStreetMap contributors, and Wikipedia. Basemap: Natural Earth. Figures: SkiDomain, the same as the tables on this page.
The 69 areas on the map, each joined to the airport the matcher plans it from; the colour is the band, dashed lines are rail, and the time sits by each name. The Alps carry 41 of the areas; the other panels are at their own scales. Hover a dot for the area’s full name and figure. Positions from OpenStreetMap and Wikipedia; coastlines, borders and lakes from Natural Earth; lines are straight joins, not routes.
7
areas under 90 minutes, all in North America
1 h 35
the quickest European route in this study, from Innsbruck
1 h 45–3 h 40
the 14 areas planned from Geneva
14 of 46
European areas within two hours: 8 from regional airports, 6 from Geneva
13
areas where rail is the usual means
23 of 71
ski-in/ski-out villages are in France

What do the figures show?

Which ski areas are quickest to reach from the airport?

Seven areas are under 90 minutes, all of them in North America: five from the regional airports Aspen, Eagle County, Hayden and Jackson Hole, which are a connecting flight from the long-haul hubs, and two from Salt Lake City, a hub with direct international service. The study counts the ground transfer only.

Which European ski areas are within two hours of landing?

Fourteen of the 46 European areas are within two hours of landing: eight from the regional airports Innsbruck (five), Salzburg (two) and Turin (one), and six from Geneva (La Clusaz 1 h 45, Megève 1 h 45, Chamonix 1 h 55, Courmayeur 2 h, Grand Massif 2 h and Portes du Soleil 2 h). The quickest European route in this study is 1 h 35, SkiWelt and Zillertal from Innsbruck; none of its Alpine routes is under 90 minutes.

Which ski areas are reached by rail?

Rail is the planned means for thirteen areas, the station at the resort or the usual way in, read from the timetable for a winter Saturday with the same 30 minutes from landing; the wait for the first train after those 30 minutes is not included. Many road-planned areas also have a rail route; the study times the usual means only.

Which country has the most ski-in/ski-out villages?

France has the most villages rated high for ski-in/ski-out, 23 of the 71 in SkiDomain’s data, and most of them lie over two hours from the airport; within two hours of landing, fourteen areas have one. A high rating means the village’s lodging mostly sits on the piste, not that every hotel in it does, and a village’s time is its area’s unless it is timed on its own; the full list is below.

Which ski areas have the longest transfers?

Twelve areas are three and a half hours or more: Åre (7 h 40), Shiga Kogen (4 h 55), Livigno (4 h 30), Hakuba (4 h 10), Zermatt (4 h), St. Moritz (4 h), Madonna di Campiglio (4 h), Hemsedal (3 h 55), Nozawa Onsen (3 h 40), Les Deux Alpes (3 h 40), Tignes–Val d'Isère (3 h 30) and Grandvalira (3 h 30). Several are among the best-known names in skiing; the transfer is the price of their position.

Europe: every ski area on the clock, by the airport the matcher plans it from One row per gateway airport, ordered by the airport’s median figure. Each dot is a ski area at its planning estimate from landing to the village; hollow dots are villages timed on their own. The colour is the transfer band. The tables below carry the same figures. 1 h 1 h 2 h 2 h 3 h 3 h 4 h 4 h 5 h 5 h landing Under 90 min 90 min to under 2 h 30 2 h 30 to under 3 h 30 3 h 30 or more Europe Innsbruck (INN) Austria 7 areas · 1 h 35 to 2 h 10 SkiWelt Wilder Kaiser–Brixental, Austria: 1 h 35 from landing to the village from Innsbruck (INN) (Austria) to Ellmau, by road (high confidence) Zillertal, Austria: 1 h 35 from landing to the village from Innsbruck (INN) (Austria) to Mayrhofen, by road (high confidence) Sölden, Austria: 1 h 45 from landing to the village from Innsbruck (INN) (Austria) to Sölden, by road (high confidence) Hintertux, Austria (a village of Zillertal): 1 h 55 from landing to the village from Innsbruck (INN) (Austria), by road (high confidence); timed on its own Ischgl–Samnaun, Austria: 1 h 55 from landing to the village from Innsbruck (INN) (Austria) to Ischgl, by road (high confidence) KitzSki, Austria: 1 h 55 from landing to the village from Innsbruck (INN) (Austria) to Kitzbühel, by road (high confidence) Ski Arlberg, Austria: 2 h 05 from landing to the village from Innsbruck (INN) (Austria) to Lech, by road (high confidence) Obergurgl–Hochgurgl, Austria: 2 h 10 from landing to the village from Innsbruck (INN) (Austria) to Obergurgl, by road (high confidence) Samnaun, Switzerland (a village of Ischgl–Samnaun): 2 h 20 from landing to the village from Innsbruck (INN) (Austria), by road (high confidence); timed on its own SkiWelt Zillertal Sölden Hintertux Ischgl Kitzbühel Ski Arlberg Obergurgl Samnaun (Switzerland) Salzburg (SZG) Austria 2 areas · 1 h 55 to 2 h Zell am See–Kaprun, Austria: 1 h 55 from landing to the village from Salzburg (SZG) (Austria) to Zell am See, by road (high confidence) Skicircus Saalbach Hinterglemm Leogang Fieberbrunn, Austria: 2 h from landing to the village from Salzburg (SZG) (Austria) to Saalbach, by road (high confidence) Zell am See Saalbach Turin (TRN) Italy 3 areas · 2 h to 2 h 40 Montgenèvre, France (a village of Via Lattea): 1 h 55 from landing to the village from Turin (TRN) (Italy), by road (high confidence); timed on its own Valtournenche, Italy (a village of Matterhorn Ski Paradise): 2 h from landing to the village from Turin (TRN) (Italy), by road (medium confidence); timed on its own Via Lattea, Italy: 2 h from landing to the village from Turin (TRN) (Italy) to Sestriere, by road (high confidence) Cervinia, Italy (a village of Matterhorn Ski Paradise): 2 h 10 from landing to the village from Turin (TRN) (Italy), by road (high confidence); timed on its own Serre Chevalier, France: 2 h 25 from landing to the village from Turin (TRN) (Italy) to Briançon, by road (high confidence) Espace San Bernardo (La Thuile – La Rosière), Italy: 2 h 40 from landing to the village from Turin (TRN) (Italy) to La Thuile, by road (medium confidence) Montgenèvre (France) Valtournenche Via Lattea Cervinia Serre Chevalier (France) La Thuile Geneva (GVA) Switzerland 14 areas · 1 h 45 to 3 h 40 Aravis (La Clusaz – Le Grand-Bornand), France: 1 h 45 from landing to the village from Geneva (GVA) (Switzerland) to La Clusaz, by road (medium confidence) Évasion Mont-Blanc / Megève, France: 1 h 45 from landing to the village from Geneva (GVA) (Switzerland) to Megève, by road (high confidence) Chamonix Mont-Blanc Valley, France: 1 h 55 from landing to the village from Geneva (GVA) (Switzerland) to Chamonix Centre, by road (high confidence) Champéry, Switzerland (a village of Portes du Soleil): 2 h from landing to the village from Geneva (GVA) (Switzerland), by road (medium confidence); timed on its own Courmayeur Mont Blanc, Italy: 2 h from landing to the village from Geneva (GVA) (Switzerland) to Courmayeur, by road (high confidence) Grand Massif, France: 2 h from landing to the village from Geneva (GVA) (Switzerland) to Flaine, by road (high confidence) Portes du Soleil, France: 2 h from landing to the village from Geneva (GVA) (Switzerland) to Morzine, by road (high confidence) Verbier 4 Vallées, Switzerland: 2 h 30 from landing to the village from Geneva (GVA) (Switzerland) to Verbier, by road (high confidence) Valmorel – Grand Domaine, France: 2 h 35 from landing to the village from Geneva (GVA) (Switzerland) to Valmorel, by road (high confidence) Crans-Montana, Switzerland: 2 h 50 from landing to the village from Geneva (GVA) (Switzerland) to Crans, by road (high confidence) Les 3 Vallées, France: 3 h from landing to the village from Geneva (GVA) (Switzerland) to Courchevel 1850, by road (high confidence) Paradiski, France: 3 h 15 from landing to the village from Geneva (GVA) (Switzerland) to Arc 1950, by road (low confidence) Alpe d'Huez Grand Domaine, France: 3 h 25 from landing to the village from Geneva (GVA) (Switzerland) to Alpe d'Huez, by road (medium confidence) La Rosière, France (a village of Espace San Bernardo (La Thuile – La Rosière)): 3 h 30 from landing to the village from Geneva (GVA) (Switzerland), by road (medium confidence); timed on its own Tignes–Val d'Isère, France: 3 h 30 from landing to the village from Geneva (GVA) (Switzerland) to Val d'Isère, by road (high confidence) Les Deux Alpes, France: 3 h 40 from landing to the village from Geneva (GVA) (Switzerland) to Les Deux Alpes, by road (high confidence) La Clusaz (France) Megève (France) Chamonix (France) Champéry Courmayeur (Italy) Grand Massif (France) Portes du Soleil (France) Verbier Valmorel (France) Crans-Montana Les 3 Vallées (France) Paradiski (France) Alpe d'Huez (France) La Rosière (France) Tignes–Val d'Isère (France) Les Deux Alpes (France) Venice (VCE) Italy 2 areas · 2 h 35 to 3 h 10 Cortina d'Ampezzo, Italy: 2 h 35 from landing to the village from Venice (VCE) (Italy) to Cortina d'Ampezzo, by road (high confidence) Sella Ronda / Dolomiti Superski core, Italy: 3 h 10 from landing to the village from Venice (VCE) (Italy) to Corvara / Colfosco, by road (high confidence) Cortina Sella Ronda Oslo (OSL) Norway 3 areas · 2 h 35 to 3 h 55 Hafjell, Norway: 2 h 35 from landing to the village from Oslo (OSL) (Norway) to Hafjell, by rail (medium confidence) Trysil, Norway: 2 h 55 from landing to the village from Oslo (OSL) (Norway) to Trysil, by road (medium confidence) Hemsedal, Norway: 3 h 55 from landing to the village from Oslo (OSL) (Norway) to Hemsedal, by road (medium confidence) Hafjell Trysil Hemsedal Zurich (ZRH) Switzerland 9 areas · 2 h 30 to 4 h LAAX, Switzerland: 2 h 30 from landing to the village from Zurich (ZRH) (Switzerland) to Laax, by road (high confidence) Engelberg-Titlis, Switzerland: 2 h 35 from landing to the village from Zurich (ZRH) (Switzerland) to Engelberg, by rail (high confidence) Silvretta Montafon, Austria: 2 h 40 from landing to the village from Zurich (ZRH) (Switzerland) to Schruns, by road (medium confidence) Stuben, Austria (a village of Ski Arlberg): 2 h 40 from landing to the village from Zurich (ZRH) (Switzerland), by road (high confidence); timed on its own Andermatt–Sedrun–Disentis, Switzerland: 2 h 45 from landing to the village from Zurich (ZRH) (Switzerland) to Andermatt, by rail (high confidence) Warth, Austria (a village of Ski Arlberg): 3 h from landing to the village from Zurich (ZRH) (Switzerland), by road (low confidence); timed on its own Davos Klosters, Switzerland: 3 h 15 from landing to the village from Zurich (ZRH) (Switzerland) to Davos, by rail (high confidence) Arosa Lenzerheide, Switzerland: 3 h 25 from landing to the village from Zurich (ZRH) (Switzerland) to Arosa, by rail (high confidence) Jungfrau Ski Region, Switzerland: 3 h 25 from landing to the village from Zurich (ZRH) (Switzerland) to Wengen, by rail (medium confidence) Engadin St. Moritz, Switzerland: 4 h from landing to the village from Zurich (ZRH) (Switzerland) to St. Moritz, by rail (high confidence) Matterhorn Ski Paradise, Switzerland: 4 h from landing to the village from Zurich (ZRH) (Switzerland) to Zermatt, by rail (high confidence) LAAX Engelberg Silvretta Montafon (Austria) Stuben (Austria) Andermatt Warth (Austria) Davos Klosters Arosa Lenzerheide Jungfrau St. Moritz Zermatt Marseille (MRS) France 1 area · 3 h 15 Risoul – Vars (Forêt Blanche), France: 3 h 15 from landing to the village from Marseille (MRS) (France) to Risoul, by road (medium confidence) Risoul–Vars Barcelona (BCN) Spain 1 area · 3 h 30 Grandvalira Resorts, Andorra: 3 h 30 from landing to the village from Barcelona (BCN) (Spain) to Soldeu, by road (medium confidence) Grandvalira (Andorra) Milan (MXP) Italy 3 areas · 2 h 30 to 4 h 30 Monterosa Ski, Italy: 2 h 30 from landing to the village from Milan (MXP) (Italy) to Champoluc, by road (high confidence) Skirama Dolomiti Adamello Brenta, Italy: 4 h from landing to the village from Milan (MXP) (Italy) to Madonna di Campiglio, by road (high confidence) Livigno, Italy: 4 h 30 from landing to the village from Milan (MXP) (Italy) to Livigno, by road (medium confidence) Monterosa Madonna di Campiglio Livigno Stockholm (ARN) Sweden 1 area · 7 h 40 Åre, Sweden: 7 h 40 from landing to the village from Stockholm (ARN) (Sweden) to Åre, by rail (medium confidence) Åre 7 h 40 →
North America: every ski area on the clock, by the airport the matcher plans it from One row per gateway airport, ordered by the airport’s median figure. Each dot is a ski area at its planning estimate from landing to the village; hollow dots are villages timed on their own. The colour is the transfer band. The tables below carry the same figures. 1 h 1 h 2 h 2 h 3 h 3 h 4 h 4 h 5 h 5 h landing Under 90 min 90 min to under 2 h 30 2 h 30 to under 3 h 30 3 h 30 or more North America Aspen (ASE) United States 1 area · 40 min Aspen Snowmass, United States: 40 min from landing to the village from Aspen/Pitkin County (ASE) (United States) to Aspen, by road (high confidence) Aspen Snowmass Hayden (HDN) United States 1 area · 1 h 05 Steamboat, United States: 1 h 05 from landing to the village from Yampa Valley / Hayden (HDN) (United States) to Steamboat Springs, by road (high confidence) Steamboat Jackson Hole (JAC) United States 1 area · 1 h 05 Jackson Hole, United States: 1 h 05 from landing to the village from Jackson Hole (JAC) (United States) to Teton Village, by road (high confidence) Jackson Hole Eagle County (EGE) United States 2 areas · 1 h to 1 h 20 Beaver Creek, United States: 1 h from landing to the village from Eagle County (EGE) (United States) to Beaver Creek Village, by road (high confidence) Vail, United States: 1 h 20 from landing to the village from Eagle County (EGE) (United States) to Vail Village, by road (high confidence) Beaver Creek Vail Salt Lake City (SLC) United States 2 areas · 1 h 10 to 1 h 15 Park City Mountain, United States: 1 h 10 from landing to the village from Salt Lake City (SLC) (United States) to Park City, by road (high confidence) Deer Valley, United States: 1 h 15 from landing to the village from Salt Lake City (SLC) (United States) to Deer Valley / Silver Lake, by road (high confidence) Park City Deer Valley Bishop (BIH) United States 1 area · 1 h 30 Mammoth Mountain, United States: 1 h 30 from landing to the village from Bishop (BIH) (United States) to Mammoth Lakes, by road (medium confidence) Mammoth Reno (RNO) United States 1 area · 1 h 30 Palisades Tahoe, United States: 1 h 30 from landing to the village from Reno-Tahoe (RNO) (United States) to Olympic Valley, by road (medium confidence) Palisades Tahoe Bozeman (BZN) United States 1 area · 1 h 45 Big Sky, United States: 1 h 45 from landing to the village from Bozeman Yellowstone (BZN) (United States) to Mountain Village, by road (medium confidence) Big Sky Calgary (YYC) Canada 1 area · 2 h 15 SkiBig3, Canada: 2 h 15 from landing to the village from Calgary (YYC) (Canada) to Banff, by road (medium confidence) Banff (SkiBig3) Montreal (YUL) Canada 1 area · 2 h 15 Tremblant, Canada: 2 h 15 from landing to the village from Montreal-Trudeau (YUL) (Canada) to Tremblant Pedestrian Village, by road (high confidence) Tremblant Denver (DEN) United States 1 area · 2 h 30 Breckenridge, United States: 2 h 30 from landing to the village from Denver (DEN) (United States) to Breckenridge, by road (medium confidence) Breckenridge Kelowna (YLW) Canada 1 area · 3 h Revelstoke Mountain Resort, Canada: 3 h from landing to the village from Kelowna (YLW) (Canada) to Revelstoke, by road (high confidence) Revelstoke Vancouver (YVR) Canada 1 area · 3 h Whistler Blackcomb, Canada: 3 h from landing to the village from Vancouver (YVR) (Canada) to Whistler Village, by road (medium confidence) Whistler
Japan: every ski area on the clock, by the airport the matcher plans it from One row per gateway airport, ordered by the airport’s median figure. Each dot is a ski area at its planning estimate from landing to the village; hollow dots are villages timed on their own. The colour is the transfer band. The tables below carry the same figures. 1 h 1 h 2 h 2 h 3 h 3 h 4 h 4 h 5 h 5 h landing Under 90 min 90 min to under 2 h 30 2 h 30 to under 3 h 30 3 h 30 or more Japan Sapporo (CTS) Japan 5 areas · 1 h 30 to 3 h 05 Kiroro, Japan: 1 h 30 from landing to the village from Sapporo (CTS) (Japan) to Kiroro, by road (high confidence) Hoshino Resorts Tomamu, Japan: 2 h 05 from landing to the village from Sapporo (CTS) (Japan) to Tomamu, by rail (high confidence) Rusutsu, Japan: 2 h 25 from landing to the village from Sapporo (CTS) (Japan) to Rusutsu, by road (high confidence) Furano, Japan: 2 h 50 from landing to the village from Sapporo (CTS) (Japan) to Furano / Kitanomine, by road (high confidence) Niseko United, Japan: 3 h 05 from landing to the village from Sapporo (CTS) (Japan) to Hirafu, by road (high confidence) Kiroro Tomamu Rusutsu Furano Niseko Tokyo Haneda (HND) Japan 3 areas · 3 h 40 to 4 h 55 from Narita, about 30 min more Nozawa Onsen, Japan: 3 h 40 from landing to the village from Tokyo Haneda (HND) (Japan) to Nozawa Onsen, by road and rail (medium confidence) Hakuba Valley, Japan: 4 h 10 from landing to the village from Tokyo Haneda (HND) (Japan) to Happo / Wadano, by road and rail (medium confidence) Shiga Kogen, Japan: 4 h 55 from landing to the village from Tokyo Haneda (HND) (Japan) to Ichinose / Takamagahara, by road and rail (medium confidence) Nozawa Onsen Hakuba Shiga Kogen Under 90 min 90 min to under 2 h 30 2 h 30 to under 3 h 30 3 h 30 or more village timed on its own
Every area on the clock, one row per gateway airport with its country, the airports ordered by their median figure; an area in another country from its airport says so. The hubs spread their areas widely (from Geneva 1 h 45 to 3 h 40; from Zurich 2 h 30 to 4 h; from Milan 2 h 30 to 4 h 30); from the regional airports Innsbruck, Salzburg and Turin, eight of the 12 areas are within two hours, and the others take up to 2 h 40 (Ski Arlberg 2 h 05, Obergurgl 2 h 10, Serre Chevalier 2 h 25 and La Thuile 2 h 40). Hover a dot for the full name, country and figure; the tables below carry the same numbers.

What is the transfer time at each of the 69 ski areas?

Europe: 46 areas

Ski areaCountryLanding to villageGateway airportReference villageUsual meansConfidence
90 minutes to under 2 h 30: 17 areas
Aravis (La Clusaz – Le Grand-Bornand)France1 h 45Geneva (GVA), SwitzerlandLa Clusazroadmedium
Chamonix Mont-Blanc ValleyFrance1 h 55Geneva (GVA), SwitzerlandChamonix Centreroadhigh
Courmayeur Mont BlancItaly2 hGeneva (GVA), SwitzerlandCourmayeurroadhigh
Évasion Mont-Blanc / MegèveFrance1 h 45Geneva (GVA), SwitzerlandMegèveroadhigh
Grand MassifFrance2 hGeneva (GVA), SwitzerlandFlaineroadhigh
Ischgl–SamnaunAustria1 h 55Innsbruck (INN), AustriaIschglroadhigh
KitzSkiAustria1 h 55Innsbruck (INN), AustriaKitzbühelroadhigh
Obergurgl–HochgurglAustria2 h 10Innsbruck (INN), AustriaObergurglroadhigh
Portes du SoleilFrance2 hGeneva (GVA), SwitzerlandMorzineroadhigh
Serre ChevalierFrance2 h 25Turin (TRN), ItalyBriançonroadhigh
Ski ArlbergAustria2 h 05Innsbruck (INN), AustriaLechroadhigh
Skicircus Saalbach Hinterglemm Leogang FieberbrunnAustria2 hSalzburg (SZG), AustriaSaalbachroadhigh
SkiWelt Wilder Kaiser–BrixentalAustria1 h 35Innsbruck (INN), AustriaEllmauroadhigh
SöldenAustria1 h 45Innsbruck (INN), AustriaSöldenroadhigh
Via LatteaItaly2 hTurin (TRN), ItalySestriereroadhigh
Zell am See–KaprunAustria1 h 55Salzburg (SZG), AustriaZell am Seeroadhigh
ZillertalAustria1 h 35Innsbruck (INN), AustriaMayrhofenroadhigh
2 h 30 to under 3 h 30: 20 areas
Alpe d'Huez Grand DomaineFrance3 h 25Geneva (GVA), SwitzerlandAlpe d'Huezroadmedium
Andermatt–Sedrun–DisentisSwitzerland2 h 45Zurich (ZRH), SwitzerlandAndermattrailhigh
Arosa LenzerheideSwitzerland3 h 25Zurich (ZRH), SwitzerlandArosarailhigh
Cortina d'AmpezzoItaly2 h 35Venice (VCE), ItalyCortina d'Ampezzoroadhigh
Crans-MontanaSwitzerland2 h 50Geneva (GVA), SwitzerlandCransroadhigh
Davos KlostersSwitzerland3 h 15Zurich (ZRH), SwitzerlandDavosrailhigh
Engelberg-TitlisSwitzerland2 h 35Zurich (ZRH), SwitzerlandEngelbergrailhigh
Espace San Bernardo (La Thuile – La Rosière)Italy2 h 40Turin (TRN), ItalyLa Thuileroadmedium
HafjellNorway2 h 35Oslo (OSL), NorwayHafjellrailmedium
Jungfrau Ski RegionSwitzerland3 h 25Zurich (ZRH), SwitzerlandWengenrailmedium
LAAXSwitzerland2 h 30Zurich (ZRH), SwitzerlandLaaxroadhigh
Les 3 ValléesFrance3 hGeneva (GVA), SwitzerlandCourchevel 1850roadhigh
Monterosa SkiItaly2 h 30Milan (MXP), ItalyChampolucroadhigh
ParadiskiFrance3 h 15Geneva (GVA), SwitzerlandArc 1950roadlow
Risoul – Vars (Forêt Blanche)France3 h 15Marseille (MRS), FranceRisoulroadmedium
Sella Ronda / Dolomiti Superski coreItaly3 h 10Venice (VCE), ItalyCorvara / Colfoscoroadhigh
Silvretta MontafonAustria2 h 40Zurich (ZRH), SwitzerlandSchrunsroadmedium
TrysilNorway2 h 55Oslo (OSL), NorwayTrysilroadmedium
Valmorel – Grand DomaineFrance2 h 35Geneva (GVA), SwitzerlandValmorelroadhigh
Verbier 4 ValléesSwitzerland2 h 30Geneva (GVA), SwitzerlandVerbierroadhigh
3 h 30 or more: 9 areas
ÅreSweden7 h 40Stockholm (ARN), SwedenÅrerailmedium
Engadin St. MoritzSwitzerland4 hZurich (ZRH), SwitzerlandSt. Moritzrailhigh
Grandvalira ResortsAndorra3 h 30Barcelona (BCN), SpainSoldeuroadmedium
HemsedalNorway3 h 55Oslo (OSL), NorwayHemsedalroadmedium
Les Deux AlpesFrance3 h 40Geneva (GVA), SwitzerlandLes Deux Alpesroadhigh
LivignoItaly4 h 30Milan (MXP), ItalyLivignoroadmedium
Matterhorn Ski ParadiseSwitzerland4 hZurich (ZRH), SwitzerlandZermattrailhigh
Skirama Dolomiti Adamello BrentaItaly4 hMilan (MXP), ItalyMadonna di Campiglioroadhigh
Tignes–Val d'IsèreFrance3 h 30Geneva (GVA), SwitzerlandVal d'Isèreroadhigh

North America: 15 areas

Ski areaCountryLanding to villageGateway airportReference villageUsual meansConfidence
Under 90 minutes: 7 areas
Aspen SnowmassUnited States40 minAspen/Pitkin County (ASE), United StatesAspenroadhigh
Beaver CreekUnited States1 hEagle County (EGE), United StatesBeaver Creek Villageroadhigh
Deer ValleyUnited States1 h 15Salt Lake City (SLC), United StatesDeer Valley / Silver Lakeroadhigh
Jackson HoleUnited States1 h 05Jackson Hole (JAC), United StatesTeton Villageroadhigh
Park City MountainUnited States1 h 10Salt Lake City (SLC), United StatesPark Cityroadhigh
SteamboatUnited States1 h 05Yampa Valley / Hayden (HDN), United StatesSteamboat Springsroadhigh
VailUnited States1 h 20Eagle County (EGE), United StatesVail Villageroadhigh
90 minutes to under 2 h 30: 5 areas
Big SkyUnited States1 h 45Bozeman Yellowstone (BZN), United StatesMountain Villageroadmedium
Mammoth MountainUnited States1 h 30Bishop (BIH), United StatesMammoth Lakesroadmedium
Palisades TahoeUnited States1 h 30Reno-Tahoe (RNO), United StatesOlympic Valleyroadmedium
SkiBig3Canada2 h 15Calgary (YYC), CanadaBanffroadmedium
TremblantCanada2 h 15Montreal-Trudeau (YUL), CanadaTremblant Pedestrian Villageroadhigh
2 h 30 to under 3 h 30: 3 areas
BreckenridgeUnited States2 h 30Denver (DEN), United StatesBreckenridgeroadmedium
Revelstoke Mountain ResortCanada3 hKelowna (YLW), CanadaRevelstokeroadhigh
Whistler BlackcombCanada3 hVancouver (YVR), CanadaWhistler Villageroadmedium

Japan: 8 areas

Ski areaCountryLanding to villageGateway airportReference villageUsual meansConfidence
90 minutes to under 2 h 30: 3 areas
Hoshino Resorts TomamuJapan2 h 05Sapporo (CTS), JapanTomamurailhigh
KiroroJapan1 h 30Sapporo (CTS), JapanKirororoadhigh
RusutsuJapan2 h 25Sapporo (CTS), JapanRusutsuroadhigh
2 h 30 to under 3 h 30: 2 areas
FuranoJapan2 h 50Sapporo (CTS), JapanFurano / Kitanomineroadhigh
Niseko UnitedJapan3 h 05Sapporo (CTS), JapanHirafuroadhigh
3 h 30 or more: 3 areas
Hakuba ValleyJapan4 h 10Tokyo Haneda (HND), JapanHappo / Wadanoroad and railmedium
Nozawa OnsenJapan3 h 40Tokyo Haneda (HND), JapanNozawa Onsenroad and railmedium
Shiga KogenJapan4 h 55Tokyo Haneda (HND), JapanIchinose / Takamagahararoad and railmedium

From Tokyo Narita (NRT), each of the three Tokyo routes takes about 30 minutes longer: the fastest Narita Express to Tokyo Station takes 53 minutes, against about 30 minutes from Haneda.

Bands: Under 90 minutes; 90 minutes to under 2 h 30; 2 h 30 to under 3 h 30; 3 h 30 or more; the same boundaries classify every count on this page. Areas are listed alphabetically within a band; the minutes are shown so you can read the spread, but the study publishes no rank, because 22 of the 69 figures are of medium or low confidence.

Which villages are timed on their own?

A ski area’s figure is to its reference village. These villages are far enough from it, or nearer another airport, to carry their own figure in the matcher; the airport is not always the area’s.

Ski areaVillage’s countryVillageLanding to villageGateway airportUsual means
Espace San Bernardo (La Thuile – La Rosière)FranceLa Rosière3 h 30Geneva (GVA), Switzerlandroad
Ischgl–SamnaunSwitzerlandSamnaun2 h 20Innsbruck (INN), Austriaroad
Les 3 ValléesFranceOrelle1 h 40Chambéry (CMF), Franceroad
Matterhorn Ski ParadiseItalyCervinia2 h 10Turin (TRN), Italyroad
Matterhorn Ski ParadiseItalyValtournenche2 hTurin (TRN), Italyroad
Portes du SoleilSwitzerlandChampéry2 hGeneva (GVA), Switzerlandroad
Ski ArlbergAustriaStuben2 h 40Zurich (ZRH), Switzerlandroad
Ski ArlbergAustriaWarth3 hZurich (ZRH), Switzerlandroad
Via LatteaFranceMontgenèvre1 h 55Turin (TRN), Italyroad
ZillertalAustriaHintertux1 h 55Innsbruck (INN), Austriaroad

Which 71 villages are rated high for ski-in/ski-out?

Villages rated high for ski-in/ski-out in SkiDomain’s data, with the estimated time from landing to the village. A high rating means most of the village’s lodging sits on the piste; it does not mean every hotel does. The time is the area’s unless the village is timed on its own. 71 villages in 9 countries; France has the most, 23.

CountryVillageSki areaLanding to villageGateway airportWhose figure
FranceMontgenèvreVia Lattea1 h 55Turin (TRN), Italyits own
FranceAvoriazPortes du Soleil2 hGeneva (GVA), Switzerlandthe area’s
FranceFlaineGrand Massif2 hGeneva (GVA), Switzerlandthe area’s
FranceValmorelValmorel – Grand Domaine2 h 35Geneva (GVA), Switzerlandthe area’s
FranceCourchevel 1850Les 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceCourchevel Moriond 1650Les 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceLa TaniaLes 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceLes MenuiresLes 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceMéribel-MottaretLes 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceVal ThorensLes 3 Vallées3 hGeneva (GVA), Switzerlandthe area’s
FranceArc 1600Paradiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceArc 1800Paradiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceArc 1950Paradiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceArc 2000Paradiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceBelle PlagneParadiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceLa Plagne 2100Paradiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceLa Plagne CentreParadiski3 h 15Geneva (GVA), Switzerlandthe area’s
FrancePeisey-VallandryParadiski3 h 15Geneva (GVA), Switzerlandthe area’s
FranceRisoulRisoul – Vars (Forêt Blanche)3 h 15Marseille (MRS), Francethe area’s
FranceAlpe d'HuezAlpe d'Huez Grand Domaine3 h 25Geneva (GVA), Switzerlandthe area’s
FranceTignes 1800 / Les BoissesTignes–Val d'Isère3 h 30Geneva (GVA), Switzerlandthe area’s
FranceTignes Le LacTignes–Val d'Isère3 h 30Geneva (GVA), Switzerlandthe area’s
FranceTignes Val ClaretTignes–Val d'Isère3 h 30Geneva (GVA), Switzerlandthe area’s
AustriaIschglIschgl–Samnaun1 h 55Innsbruck (INN), Austriathe area’s
AustriaHinterglemmSkicircus Saalbach Hinterglemm Leogang Fieberbrunn2 hSalzburg (SZG), Austriathe area’s
AustriaLeogangSkicircus Saalbach Hinterglemm Leogang Fieberbrunn2 hSalzburg (SZG), Austriathe area’s
AustriaSaalbachSkicircus Saalbach Hinterglemm Leogang Fieberbrunn2 hSalzburg (SZG), Austriathe area’s
AustriaSt. ChristophSki Arlberg2 h 05Innsbruck (INN), Austriathe area’s
AustriaHochgurglObergurgl–Hochgurgl2 h 10Innsbruck (INN), Austriathe area’s
AustriaObergurglObergurgl–Hochgurgl2 h 10Innsbruck (INN), Austriathe area’s
AustriaStubenSki Arlberg2 h 40Zurich (ZRH), Switzerlandits own
AustriaWarthSki Arlberg3 hZurich (ZRH), Switzerlandits own
ItalyPragelatoVia Lattea2 hTurin (TRN), Italythe area’s
ItalySestriereVia Lattea2 hTurin (TRN), Italythe area’s
ItalyArabbaSella Ronda / Dolomiti Superski core3 h 10Venice (VCE), Italythe area’s
ItalyCorvara / ColfoscoSella Ronda / Dolomiti Superski core3 h 10Venice (VCE), Italythe area’s
ItalyLa VillaSella Ronda / Dolomiti Superski core3 h 10Venice (VCE), Italythe area’s
ItalySelva Val GardenaSella Ronda / Dolomiti Superski core3 h 10Venice (VCE), Italythe area’s
ItalyFolgarida-MarillevaSkirama Dolomiti Adamello Brenta4 hMilan (MXP), Italythe area’s
ItalyMadonna di CampiglioSkirama Dolomiti Adamello Brenta4 hMilan (MXP), Italythe area’s
ItalyPasso TonaleSkirama Dolomiti Adamello Brenta4 hMilan (MXP), Italythe area’s
JapanKiroroKiroro1 h 30Sapporo (CTS), Japanthe area’s
JapanTomamuHoshino Resorts Tomamu2 h 05Sapporo (CTS), Japanthe area’s
JapanRusutsuRusutsu2 h 25Sapporo (CTS), Japanthe area’s
JapanHanazonoNiseko United3 h 05Sapporo (CTS), Japanthe area’s
JapanNiseko VillageNiseko United3 h 05Sapporo (CTS), Japanthe area’s
JapanCortina / NorikuraHakuba Valley4 h 10Tokyo Haneda (HND), Japanthe area’s
JapanIchinose / TakamagaharaShiga Kogen4 h 55Tokyo Haneda (HND), Japanthe area’s
JapanOkushiga KogenShiga Kogen4 h 55Tokyo Haneda (HND), Japanthe area’s
JapanYakebitaiyamaShiga Kogen4 h 55Tokyo Haneda (HND), Japanthe area’s
United StatesSnowmass VillageAspen Snowmass40 minAspen/Pitkin County (ASE), United Statesthe area’s
United StatesBeaver Creek VillageBeaver Creek1 hEagle County (EGE), United Statesthe area’s
United StatesTeton VillageJackson Hole1 h 05Jackson Hole (JAC), United Statesthe area’s
United StatesCanyons VillagePark City Mountain1 h 10Salt Lake City (SLC), United Statesthe area’s
United StatesDeer Valley / Silver LakeDeer Valley1 h 15Salt Lake City (SLC), United Statesthe area’s
United StatesLionsheadVail1 h 20Eagle County (EGE), United Statesthe area’s
United StatesVail VillageVail1 h 20Eagle County (EGE), United Statesthe area’s
United StatesOlympic ValleyPalisades Tahoe1 h 30Reno-Tahoe (RNO), United Statesthe area’s
United StatesMountain VillageBig Sky1 h 45Bozeman Yellowstone (BZN), United Statesthe area’s
AndorraEl TarterGrandvalira Resorts3 h 30Barcelona (BCN), Spainthe area’s
AndorraGrau RoigGrandvalira Resorts3 h 30Barcelona (BCN), Spainthe area’s
AndorraPas de la CasaGrandvalira Resorts3 h 30Barcelona (BCN), Spainthe area’s
AndorraSoldeuGrandvalira Resorts3 h 30Barcelona (BCN), Spainthe area’s
CanadaTremblant Pedestrian VillageTremblant2 h 15Montreal-Trudeau (YUL), Canadathe area’s
CanadaCreeksideWhistler Blackcomb3 hVancouver (YVR), Canadathe area’s
CanadaUpper VillageWhistler Blackcomb3 hVancouver (YVR), Canadathe area’s
NorwayHafjellHafjell2 h 35Oslo (OSL), Norwaythe area’s
NorwayTrysilTrysil2 h 55Oslo (OSL), Norwaythe area’s
NorwayHemsedalHemsedal3 h 55Oslo (OSL), Norwaythe area’s
SwitzerlandLaaxLAAX2 h 30Zurich (ZRH), Switzerlandthe area’s
SwitzerlandVeysonnazVerbier 4 Vallées2 h 30Geneva (GVA), Switzerlandthe area’s

How this was measured. The median of the published typical journey times from the resort’s own site and established transfer operators, rail from a winter Saturday timetable, plus a flat 30 minutes from landing, rounded to five minutes; the wait for a scheduled departure is not included; all 69 areas audited on 2 and 3 October 2026. Each route’s basis, median, allowance and result are in the sources at the foot of the page. Research and figures: SkiDomain; the planning rules (which airport, which means) are Expeditioner Travel’s.

How were the transfer times measured?

What is compared. The time from landing at the gateway airport to arriving in the ski area’s reference village by the usual means, road or rail: 30 minutes after landing plus the published journey. The wait for a scheduled departure is not included; the next paragraph says why. It is the figure SkiDomain’s matcher uses for the traveller’s transfer limit. What is not compared: flight frequency, direct long-haul connections, airfares and the total journey from home. An area 70 minutes from a regional airport with a few flights a day can be harder to reach from another continent than one 150 minutes from Geneva or Zurich.

The figure. The median of the published typical journey times, one per source: the resort’s official site where it gives one, and established transfer operators, with a range counted at its midpoint and rail read from the timetable for a winter Saturday; plus 30 minutes from landing to departure; rounded to five minutes. The 30 minutes are a convention for immigration, baggage and reaching the transfer, and they assume the transfer is ready when you are. A private transfer is; a train or a scheduled bus leaves on its timetable, and the wait for the first departure after the 30 minutes is not included. Where trains run hourly, as to Andermatt, that can add up to an hour; where the timetable was read, the route’s basis in the sources gives the departures. Booking-platform figures computed from map routing are not used where an operator states a time. The calibration point is Geneva to Courchevel 1850: 2 h 30 by road, so 180 minutes from landing to the village. All 69 areas were audited on 2 and 3 October 2026; eight were then re-timed from a different airport by the same method (Alpe d’Huez and Les Deux Alpes from Geneva, Risoul–Vars from Marseille, Mammoth from Bishop, the Via Lattea and Serre Chevalier from Turin, Saalbach and Zell am See–Kaprun from Salzburg).

The gateway. The airport the matcher plans the trip from: a hub a visitor from abroad would use (Barcelona, Geneva, Milan, Oslo, Stockholm, Zurich; Tokyo and Sapporo; North America airport by airport), with the regional airports Innsbruck for the Tyrol, Salzburg for the Salzburgerland and Turin for the Piedmont side and for Serre Chevalier over the Montgenèvre, and Venice for the Dolomites and Marseille for Risoul–Vars, as named exceptions. It is not always the nearest airport: Alpe d’Huez and Les Deux Alpes are planned from Geneva although Grenoble and Lyon are nearer, because Geneva is the study’s chosen gateway for the French Alps; Åre is timed from Stockholm although Östersund is nearer. Tokyo means Haneda (HND). From Tokyo Narita (NRT), each of the three Tokyo routes takes about 30 minutes longer: the fastest Narita Express to Tokyo Station takes 53 minutes, against about 30 minutes from Haneda. The tables, the picker and the sources say so beside the figures.

Timetables. Rail and bus times are read for a winter Saturday (16 January 2027) where the 2026/27 timetable was published at the check date; where it was not, the latest published timetable stands in as a proxy, the route’s basis in the sources below says so, and its confidence is medium.

Confidence. The label grades the journey time the sources give, from departure to the village, not the whole estimate: the 30 minutes after landing are the same convention on every route, and the wait for a scheduled departure is not counted, so even a figure read from a timetable is a planning estimate. High, 47 areas: the official timetable for the date, every leg; or three or more published figures from the resort, the tourist office or transport operators, within half an hour of each other (where there are five or more, one outlier is set aside); or, where the resort’s own figure is the only one, an independent check that confirms it (Aspen: 10 minutes, with the airport 3 miles from town). Medium, 21: two figures; a wider spread; an assumed connection or another season’s timetable standing in; a figure derived from a neighbouring village’s; or a known condition the figures leave out, such as roadworks or a village beyond the operators’ drop-off. Low, 1: the figures describe another place than the one timed, or fewer than two come from the resort or a transport operator. The label is computed from each route’s recorded figures, and the sources at the foot of the page give each route’s reason.

Which of these fits your week? The matcher applies your dates, ability, group, pass and the longest transfer you will accept before it scores anything, across all 69 areas and 178 villages.

Find my ski match The ski areas

SkiDomain is the ski destination matcher of Expeditioner Travel, who book the trip, the transfer included, once the matcher has done its part. Figures as of 3 October 2026; model SkiDomain engine v12.20 — build F81, 2026-11-14 (data: workbook v15.15).

Where does each figure come from?

Each area’s published figures and the minutes taken from each, with the date it was checked. The figures change when an operator’s published time does, and this page carries the date.

Alpe d'Huez Grand Domaine · 3 h 25 from Geneva (GVA) · medium confidence · checked 3 October 2026

Basis. median of five figures, Geneva Airport to Alpe d'Huez: Ski-Lifts 2h30 (150); resort official site 2h45 by car (165); Snowcompare 2h45-3h (172.5); Ben's Bus 3h15 (195); Alpine Fleet 3h30 (210) = 172.5

Calculation. 172½ minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 25.

Confidence in the journey time: medium. Five published figures, spread over 45 minutes even with one set aside.

Andermatt–Sedrun–Disentis · 2 h 45 from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. All 12 hourly connections Zürich Flughafen → Andermatt departing 08:49–19:49 on Sat 16 Jan 2027 take 2h17 (IC 5 then IC 2 + IR 26 or IR 46, final leg regional train R; 2–3 changes).

Calculation. 137 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 45. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Aravis (La Clusaz – Le Grand-Bornand) · 1 h 45 from Geneva (GVA) · medium confidence · checked 2 October 2026

Basis. median of 3 operator figures: Alpine Fleet ~1h (60); Ski-Lifts 1h15 (75); Alps Holiday Transfers 1h20 (80)

Calculation. 75 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 45.

Confidence in the journey time: medium. The resort warns that roadworks may add about 30 minutes, which the figures do not include.

Åre · 7 h 40 from Stockholm (ARN) · medium confidence · checked 2 October 2026

Basis. Direct SJ train from Arlanda C to Åre station (in the village centre, so no final leg). The InterCity is SJ's year-round day service (2 a day each way). Median of the 4 direct InterCity journey times between Arlanda C and Åre seen in Trafikverket timetable data on 2 Oct 2026 (6h29, 6h34, 7h48, 9h06) = 431 min. This agrees with SJ's 'usually about 7.5 h' from Stockholm C, since trains call at Arlanda about 20 min later. Southbound timings were used as a proxy for two of the four values.

Calculation. 431 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 7 h 40. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. Read from the autumn 2026 timetable, as the winter one (from 13 December 2026) was not yet published, with southbound trains standing in for two of the four times.

Arosa Lenzerheide · 3 h 25 from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. Median of the 12 connections Zürich Flughafen → Arosa departing 08:15–17:15 on Sat 16 Jan 2027: 10 × 2h54 (hourly at :15, IR 75 / IC to Chur, then the Chur–Arosa line) and 2 × 2h49 (10:49, 13:49); 2 changes.

Calculation. 174 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 25. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Aspen Snowmass · 40 min from Aspen/Pitkin County (ASE) · high confidence · checked 2 October 2026

Basis. Single published typical figure: Aspen Snowmass (official) says ASE is 10 min from downtown Aspen; consistent with the airport's 3-mile distance.

Calculation. 10 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 40 min.

Confidence in the journey time: high. The resort’s own figure, 10 minutes, the only one published; the airport is 3 miles from town.

Beaver Creek · 1 h from Eagle County (EGE) · high confidence · checked 3 October 2026

Basis. Median of published typical EGE→Beaver Creek figures: Epic Mountain Express shared 45 min, Beaver Creek official 30 min, Blue Sky Limo private 30 min → 30. checked 2026-10-02

Calculation. 30 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h.

Confidence in the journey time: high. Three published figures, all within 15 minutes of each other.

Big Sky · 1 h 45 from Bozeman Yellowstone (BZN) · medium confidence · checked 2 October 2026

Basis. Median of 60 (Big Sky Resort official: approximately one hour), 75 (Karst Stage: approx. 1 hr 15 min) and 90 (Big Sky Adventure Tours: ~1.5 h +/- 30 min, i.e. 1-2 h midpoint).

Calculation. 75 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 45.

Confidence in the journey time: medium. The resort’s “approximately one hour” is for Big Sky generally; the reference village, Mountain Village, lies beyond.

Breckenridge · 2 h 30 from Denver (DEN) · medium confidence · checked 3 October 2026

Basis. Median of published typical DEN→Breckenridge figures: Epic Mountain Express ~2h, Peak 1 Express ~2h (discount shared and private) and ~2.5h (door-to-door shared), GoBreck '1.5 hours' → 120. checked 2026-10-02

Calculation. 120 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 30.

Confidence in the journey time: medium. Four published figures, spread over 60 minutes.

Chamonix Mont-Blanc Valley · 1 h 55 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Chamonix official 1h15, Ski-Lifts 1h15, Mountain Drop-offs 1h15–1h30 (mid 1h22.5), Alps2Alps 80–90 min (mid 85), Alpybus 1h30 → 82.5 min, rounded to 83

Calculation. 83 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 55.

Confidence in the journey time: high. Five published figures, four of them within 10 minutes of each other.

Cortina d'Ampezzo · 2 h 35 from Venice (VCE) · high confidence · checked 2 October 2026

Basis. median of 6 published typical figures (107, 120, 120, 129, 130, 150 min: AlpinBus 107; Cortina Express (direct airport bus) 120; Hoppa 120; MyTransfers 129; Shuttle Direct 130; Ski-Lifts 150); Alps2Alps has no VCE–Cortina route page (blog 'around two hours', airport page 135 km (84 miles) / 2h 15m) so excluded; one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 125 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 35.

Confidence in the journey time: high. Six published figures, five of them within 23 minutes of each other.

Courmayeur Mont Blanc · 2 h from Geneva (GVA) · high confidence · checked 2 October 2026

Basis. median of 8 published typical figures (88, 90, 90, 90, 90, 100, 105, 120 min: AlpinBus 88; Alps2Alps 90; Shuttle Direct 90; Skicab 90; Alpine Fleet 90; AlpyBus 100; Ski-Lifts (midpoint of 1h30–2h) 105; Mountain Drop-offs 120); official courmayeurmontblanc.it gives distance only (Geneva 115 km (71 miles)); one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 90 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h.

Confidence in the journey time: high. Eight published figures, seven of them within 17 minutes of each other.

Crans-Montana · 2 h 50 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. Median of 7 published typical GVA → Crans-Montana road figures: official tourism 2h30, Skicab 2h30, AlpinBus 2h24, Genevaways 2h20, Blacklane 2h–2h30 (midpoint 2h15), Alps2Alps 2h, Ski-Lifts 2h → 2h20.

Calculation. 140 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 50.

Confidence in the journey time: high. Seven published figures, all within 30 minutes of each other.

Davos Klosters · 3 h 15 from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. Median of the 16 connections Zürich Flughafen → Davos Platz departing 08:15–15:49 on Sat 16 Jan 2027: 8 × 2h38 (dep :49, IC 5 / IC 3 / RE13) and 8 × 2h48 (dep :15, IR 75 / IC / RE24); 2 changes; median 2h43.

Calculation. 163 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 15. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Deer Valley · 1 h 15 from Salt Lake City (SLC) · high confidence · checked 2 October 2026

Basis. Median of three figures: 45 (Canyon Transportation private SUV/Sprinter, SLC to Montage Deer Valley at Empire Pass, near Silver Lake); 50 (midpoint of Canyon's 40 min-1 h typical for its winter 2026-27 shared shuttle); 45 (Stein Eriksen Lodge, which is in Silver Lake village). Deer Valley's own page gives distance only (38 miles).

Calculation. 45 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 15.

Confidence in the journey time: high. Three published figures, all within 5 minutes of each other.

Engadin St. Moritz · 4 h from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. Median of the 16 scheduled connections Zürich Flughafen → St. Moritz departing 08:15–15:49 on Sat 16 Jan 2027 (2027 timetable): 8 × 3h23 (dep :49, IC 5 / IC 3 / RE13, 2 changes) and 8 × 3h40 (dep :15, IR 75 / IC / IR 38, 2 changes); median 3h31.5, fastest 3h23.

Calculation. 212 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Engelberg-Titlis · 2 h 35 from Zurich (ZRH) · high confidence · checked 2 October 2026

Basis. scheduled rail journey on a winter Saturday (16 Jan 2027, 2027 timetable): standard hourly connection Zürich Flughafen -> Luzern (IR 75) -> Engelberg (Zentralbahn) 2h07 with 1 change; median of the four connections returned (2h04, 2h07, 2h07, 2h14) is 2h07. Engelberg station is in the village, no further leg.

Calculation. 127 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 35. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Espace San Bernardo (La Thuile – La Rosière) · 2 h 40 from Turin (TRN) · medium confidence · checked 2 October 2026

Basis. median of 5 published figures: La Thuile official 2h10 from Turin (130); Alps2Alps 2h10 (130); La Thuile Transfers 2h20 (140); GoTransferPeak ~1h45 (105); Ski-Lifts ~3h (180, outlier)

Calculation. 130 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 40.

Confidence in the journey time: medium. Five published figures, spread over 35 minutes even with one set aside.

Évasion Mont-Blanc / Megève · 1 h 45 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Megève Tourisme 1h15, Mountain Drop-offs 1h15, Alps2Alps 1h15, Ski-Lifts 1h15–1h30 (mid 1h22.5) → 1h15

Calculation. 75 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 45.

Confidence in the journey time: high. Four published figures, all within 7½ minutes of each other.

Furano · 2 h 50 from Sapporo (CTS) · high confidence · checked 3 October 2026

Basis. Median of published typical winter CTS→Furano figures: Hokkaido Bus 'Gori Liner' ~125 min and car ~132 min (New Furano Prince Hotel, resort operator), Hokkaido Resort Liner 2h15 to New Furano Prince–2h45 to Edel Warme/Kitanomine (midpoint 150), SkyStation private ~2h30 (150) → 141. Furano Tourism Assoc. 'about 2 hours' (summer timetable, 'winter slightly longer') not used. checked 2026-10-02

Calculation. 141 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 50.

Confidence in the journey time: high. Four published figures, all within 25 minutes of each other.

Grand Massif · 2 h from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Flaine official 2h (by bus), Ski-Lifts 1h45, Mountain Drop-offs 1h30, Alpybus 1h20, Alps2Alps 1h15 → 1h30

Calculation. 90 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h.

Confidence in the journey time: high. Five published figures, four of them within 30 minutes of each other.

Grandvalira Resorts · 3 h 30 from Barcelona (BCN) · medium confidence · checked 2 October 2026

Basis. Median of 3 published typical BCN→Soldeu times: Hoppa 2h45, Alps2Alps 3h00 (private), Andbus shared transfer ~4h (winter 2026–27 timetable: BCN T1 06:45 → Soldeu 11:00) → 180 min. Costa Brava Taxi's '170–190 minutes' was left out because its FAQ text names Blanes, so it may be template copy.

Calculation. 180 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 30.

Confidence in the journey time: medium. Three published figures, spread over 75 minutes.

Hafjell · 2 h 35 from Oslo (OSL) · medium confidence · checked 2 October 2026

Basis. The official page tells air travellers to take the train. Vy RE10 runs hourly on Saturdays, OSL xx:59 → Lillehammer xx:41, typically 1h42 (102 min; range 1h38–1h46). Assumed change at Lillehammer skysstasjon (bus terminal at the station): 10 min. Bus to Hafjell Alpinsenter: about 15 min (official). Total 127 min.

Calculation. 127 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 35. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. The Vy timetable read runs to 12 December 2026; a 10-minute change at Lillehammer is assumed.

Hakuba Valley · 4 h 10 from Tokyo Haneda (HND) · medium confidence · checked 3 October 2026

Basis. Timetable model from HND station: ~30 min to Tokyo Stn (Haneda official) + 10-min transfer, Hokuriku Shinkansen to Nagano (Sat 16 Jan 2027), ≥10-min change, Alpico express bus Nagano→Happo Bus Terminal 70 min (2025-26 winter timetable). Median of 8 efficient itineraries 206–239 min = 220.5. checked 2026-10-02

Calculation. 221 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h 10. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. Last winter’s Alpico bus timetable stands in for 2026/27; a model with assumed changes (about 30 minutes from Haneda to Tokyo Station plus 10, at least 10 at Nagano).

From Narita (NRT). About 30 minutes longer: the fastest Narita Express to Tokyo Station takes 53 minutes (JR East, checked 3 October 2026), against about 30 minutes from Haneda.

Hemsedal · 3 h 55 from Oslo (OSL) · medium confidence · checked 2 October 2026

Basis. Median of 4 published typical OSL→Hemsedal times: MyTransfers 3h04, Ski-Lifts 3h20, official VY51 transfer bus ~3h30, JamTransfer 3h44 → 205 min.

Calculation. 205 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 55.

Confidence in the journey time: medium. Four published figures, spread over 40 minutes.

Hoshino Resorts Tomamu · 2 h 05 from Sapporo (CTS) · high confidence · checked 3 October 2026

Basis. Scheduled JR itineraries, Sat 16 Jan 2027: Rapid Airport 3 min to Minami-Chitose, ~10–12 min change, Ozora/Tokachi 61–78 min (10 trains, median 70), free resort shuttle ~5 min that meets every train → median 95 (86–103). Consistent with official 'min. 90 minutes' + 5-min shuttle. checked 2026-10-02

Calculation. 95 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 05. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The JR timetable for Saturday 16 January 2027, with the resort’s shuttle, which meets every train.

Ischgl–Samnaun · 1 h 55 from Innsbruck (INN) · high confidence · checked 2 October 2026

Basis. median of 8 published typical figures (77, 79, 80, 80, 90, 90, 90, 120 min: Shuttle Direct 77; AlpinBus (reverse-direction page) 79; Alps2Alps 80; Ski-Lifts 80; Hoppa 90; Taxi Innsbruck Airport 90; SIXT ride 90; Holiday Taxis 120); official ischgl.com gives distance only (Innsbruck Airport 100 km (62 miles)); one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 85 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 55.

Confidence in the journey time: high. Eight published figures, seven of them within 13 minutes of each other.

Jackson Hole · 1 h 05 from Jackson Hole (JAC) · high confidence · checked 2 October 2026

Basis. Median of 36 (Jackson Hole Mountain Resort official: 36-minute drive), 37.5 (midpoint of Prime Time Shuttle's 35-40 min) and 30 (midpoint of The Driver Provider's 25-35 min).

Calculation. 36 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 05.

Confidence in the journey time: high. Three published figures, all within 7½ minutes of each other.

Jungfrau Ski Region · 3 h 25 from Zurich (ZRH) · medium confidence · checked 3 October 2026

Basis. Median of the 16 connections Zürich Flughafen → Wengen departing 08:09–15:46 on Sat 5 Dec 2026 (current timetable; see notes on the 2027 data): 8 × 2h55, 6 × 2h56, 2 × 3h02, via Bern/Interlaken Ost, BOB to Lauterbrunnen, Wengernalpbahn to Wengen; median 2h55.5.

Calculation. 176 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 25. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. Read from the 2026 timetable (Saturday 5 December 2026), standing in for the 2027 one, which lacked the Wengernalpbahn at the check.

Kiroro · 1 h 30 from Sapporo (CTS) · high confidence · checked 3 October 2026

Basis. Median of published typical CTS→Kiroro transfer times: Club Med shared transfer 2h (120), Club Med private transfer 1h30 (90), SkyStation private about 2h incl. 15-min rest stop (120) → 120. checked 2026-10-02

Calculation. 120 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 30.

Confidence in the journey time: high. Three published figures, all within 30 minutes of each other.

KitzSki · 1 h 55 from Innsbruck (INN) · high confidence · checked 3 October 2026

Basis. Median of 6 published typical INN → Kitzbühel figures: Alps2Alps 1h35, Hoppa 1h20–1h45 (midpoint 1h32.5), Ski-Lifts 1h30, AlpinBus 1h21, Taxi Innsbruck Airport 1h20, Innsbruck Airport Transfer 80 min → 1h25.5. Alps2Alps's route-page 'as little as 1 hour 20 minutes' is a minimum, so its hub-table figure is used.

Calculation. 86 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 55.

Confidence in the journey time: high. Six published figures, five of them within 12½ minutes of each other.

LAAX · 2 h 30 from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. Median of 3 published typical ZRH → Laax transfer figures: AlpinBus 1h48, Ski-Lifts about 2h, 3Valley Transfers about 2h → 2h. (The LAAX airport shuttle publishes no duration.)

Calculation. 120 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 30.

Confidence in the journey time: high. Three published figures, all within 12 minutes of each other.

Les 3 Vallées · 3 h from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of four named operators' typical Geneva–Courchevel times: Ski-Lifts 2h15–2h45 (mid 2h30), Mountain Drop-offs 2h30, Alpy 2h30, Alps2Alps 2h10 → 2h30; reproduces the D-130 calibration (Courchevel official site not re-read because the calibration is already decided)

Calculation. 150 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h.

Confidence in the journey time: high. Four published figures, all within 20 minutes of each other.

Les Deux Alpes · 3 h 40 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of four operator figures, Geneva Airport to Les Deux Alpes: Ski-Lifts 3h00 (180); Snowcompare around 3h (180); Ben's Bus 3h15 (195); Alpine Fleet 3h15 (195) = 187.5; the resort's official page gives the distance only (220 km (137 miles))

Calculation. 187½ minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 40.

Confidence in the journey time: high. Four published figures, all within 15 minutes of each other.

Livigno · 4 h 30 from Milan (MXP) · medium confidence · checked 2 October 2026

Basis. Median of 4 published typical transfer times MXP→Livigno: AlpinBus 3h43, Milan Airport Transfers 3h45, Alps2Alps 4h10 (private), Livigno Express shared shuttle 4h40 → 237.5 min, rounded half-up to 238. Silvestri's 'just over 3½ hours by car' is a driving time from the same company as Livigno Express, so not counted separately.

Calculation. 238 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h 30.

Confidence in the journey time: medium. Four published figures, spread over 57 minutes.

Mammoth Mountain · 1 h 30 from Bishop (BIH) · medium confidence · checked 3 October 2026

Basis. median of two published figures, Eastern Sierra Regional Airport (Bishop) to Mammoth Lakes: Visit Mammoth 45 minutes (45); Eastern Sierra Transit Mammoth Express timetable, Bishop Airport 13:00 to Mammoth Lakes 14:15 with a stop in Bishop (75) = 60

Calculation. 60 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 30.

Confidence in the journey time: medium. Two published figures.

Matterhorn Ski Paradise · 4 h from Zurich (ZRH) · high confidence · checked 3 October 2026

Basis. Swiss timetable for Saturday 16 Jan 2027: Zürich Flughafen 09:46 IC 8 → Visp 12:04, change, Visp 12:09 → Zermatt 13:14 = 3h28 (hourly; the :15 departures take 3h32 with 3 changes). Zermatt station is in the car-free village centre, so there is no further leg

Calculation. 208 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h. The wait for the first departure after the allowance is not included.

Confidence in the journey time: high. The official Swiss timetable for Saturday 16 January 2027, every leg.

Monterosa Ski · 2 h 30 from Milan (MXP) · high confidence · checked 2 October 2026

Basis. median of 7 published typical figures (120, 120, 120, 120, 124, 125, 155 min: Ski-Lifts 120; Champoluc Transfer 120; Milan Airport Transfers 120; TransferMe24 120; Shuttle Direct 124; AlpinBus (reverse-direction page) 125; Alps2Alps 155); official visitmonterosa.com gives distance only (Milano-Malpensa 169 km (105 miles)); one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 120 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 30.

Confidence in the journey time: high. Seven published figures, six of them within 5 minutes of each other.

Niseko United · 3 h 05 from Sapporo (CTS) · high confidence · checked 2 October 2026

Basis. Median of 5 published typical CTS→Hirafu times: White Liner 2h30, Nisade 2h30 (midpoint of 2–3 h), Hokkaido Resort Liner 2h35 (2h30, or about 2h40 with the Rusutsu stop), Holiday Niseko 2h45 (midpoint of 2.5–3 h, Nov–Feb), Chuo Bus 3h33 (Hirafu is its last stop) → 155 min. Rail (JR via Otaru to Kutchan, then taxi) is possible but not the usual way in.

Calculation. 155 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 05.

Confidence in the journey time: high. Five published figures, four of them within 15 minutes of each other.

Nozawa Onsen · 3 h 40 from Tokyo Haneda (HND) · medium confidence · checked 3 October 2026

Basis. Timetable model from HND station: ~30 min to Tokyo Stn + 10-min transfer, Hakutaka to Iiyama 98–117 min (Sat 16 Jan 2027; only Hakutaka stops), ≥10-min change, Nozawa Onsen Liner 25 min to Chuo Terminal (2026 timetable). Median of 7 efficient itineraries 176–208 min. checked 2026-10-02

Calculation. 191 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 40. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. The Nozawa Onsen Liner’s March–November 2026 timetable stands in for the winter one; a model with assumed changes (about 30 minutes from Haneda to Tokyo Station plus 10, at least 10 at Iiyama).

From Narita (NRT). About 30 minutes longer: the fastest Narita Express to Tokyo Station takes 53 minutes (JR East, checked 3 October 2026), against about 30 minutes from Haneda.

Obergurgl–Hochgurgl · 2 h 10 from Innsbruck (INN) · high confidence · checked 2 October 2026

Basis. median of 6 published typical figures (85, 87, 90, 105, 106, 130 min: Taxi Innsbruck Airport 85; AlpinBus 87; Hoppa 90; Ski-Lifts 105; Shuttle Direct 106; Holiday Taxis 130); official gurgl.com 'Plane' page excluded: its table is headed 'Distance to Sölden' (83 km (52 miles), 1 h 15); Alps2Alps has no route page (destination page: 97 km (60 miles) / 1h 16m); one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 98 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 10.

Confidence in the journey time: high. Six published figures, five of them within 21 minutes of each other.

Palisades Tahoe · 1 h 30 from Reno-Tahoe (RNO) · medium confidence · checked 2 October 2026

Basis. Median of 60 (North Lake Tahoe Express winter timetable: Olympic Valley 6:45 am to RNO 7:45 am; same 60 min on the July 2026 timetable) and 60 (Ridebooker: drive usually 50-70 min, midpoint). Palisades Tahoe's official page gives distance only (Reno 42 miles).

Calculation. 60 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 30.

Confidence in the journey time: medium. Two published figures.

Paradiski · 3 h 15 from Geneva (GVA) · low confidence · checked 3 October 2026

Basis. median of Les Arcs official 2h30, Mountain Drop-offs approx. 2h30, Ski-Lifts 2h45, Alpybus 2h45, Alps2Alps 2h23 → 2h30; all are figures for 'Les Arcs' as a whole, none for Arc 1950 itself

Calculation. 150 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 15.

Confidence in the journey time: low. The published figures are for Les Arcs as a whole; Arc 1950, the village timed, is the farthest of its villages.

Park City Mountain · 1 h 10 from Salt Lake City (SLC) · high confidence · checked 3 October 2026

Basis. Median of published typical SLC→Park City figures: Park City Mountain official 35–45 min (40), Visit Park City 35 min, Ridebooker 35–45 min (40) → 40. checked 2026-10-02

Calculation. 40 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 10.

Confidence in the journey time: high. Three published figures, all within 5 minutes of each other.

Portes du Soleil · 2 h from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Morzine official approx. 1¼ h, Alps2Alps 1h30, Ski-Lifts 1h30, Mountain Drop-offs 1h30 → 1h30

Calculation. 90 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h.

Confidence in the journey time: high. Four published figures, all within 15 minutes of each other.

Revelstoke Mountain Resort · 3 h from Kelowna (YLW) · high confidence · checked 2 October 2026

Basis. Median of 150 (Revelstoke Mountain Resort official: approximately a 2.5-hour drive; Tourism Revelstoke says the same, counted once), 165 (Revelstoke Transfers: typically 2.5-3 h, midpoint) and 150 (Kelowna Transfers: about 2.5 hours).

Calculation. 150 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h.

Confidence in the journey time: high. Three published figures, all within 15 minutes of each other.

Risoul – Vars (Forêt Blanche) · 3 h 15 from Marseille (MRS) · medium confidence · checked 3 October 2026

Basis. median of three published figures, Marseille Provence Airport to Risoul: Shuttle Direct 2h43 (163); MyTransfers 2h38 (158); the resort's official Navettes Blanches coach, line 50, 14:50 to 19:00 with stops (250) = 163

Calculation. 163 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 15.

Confidence in the journey time: medium. Three published figures, spread over 92 minutes.

Rusutsu · 2 h 25 from Sapporo (CTS) · high confidence · checked 2 October 2026

Basis. Median of 4 published typical CTS→Rusutsu times: MyTransfers 1h38, SamuraiSnow 1h45 (midpoint of 1.5–2 h), Japan Ski Experience ~2h, official BIGRUNS resort bus 120 min → 112.5 min, rounded half-up to 113.

Calculation. 113 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 25.

Confidence in the journey time: high. Four published figures, all within 22 minutes of each other.

Sella Ronda / Dolomiti Superski core · 3 h 10 from Venice (VCE) · high confidence · checked 2 October 2026

Basis. median of 6 published typical figures (148, 150, 155, 160, 169, 269 min: AlpinBus 148; Ski-Lifts (Alta Badia) 150; Italy Private Transfers (reverse-direction page) 155; Hoppa 160; MyTransfers 169; Shuttle Direct 269, whose 287 km (178 miles) is far above the others' 171–175 km (106–109 miles), kept as the method keeps every operator figure); Alps2Alps has no VCE–Corvara route page (destination page 190 km (118 miles) / 3h 0m) so excluded; skicorvara.com gives distance only (174 km (108 miles)); one figure per operator (its route page; ranges -> midpoint); journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 157½ minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 10.

Confidence in the journey time: high. Six published figures, five of them within 21 minutes of each other.

Serre Chevalier · 2 h 25 from Turin (TRN) · high confidence · checked 3 October 2026

Basis. median of the tourist office's Turin figure and three operators' typical Turin Airport→Serre Chevalier times: Serre Chevalier Vallée Briançon (official) 'Only 1h30' (90), Alps2Alps 1h45 (105), Ski-Lifts approx. 2 hours (120), go-serre-chevalier 2 hours (120) → 112.5

Calculation. 112½ minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 25.

Confidence in the journey time: high. Four published figures, all within 30 minutes of each other.

Shiga Kogen · 4 h 55 from Tokyo Haneda (HND) · medium confidence · checked 3 October 2026

Basis. Timetable model from HND station: ~30 min to Tokyo Stn + 10-min transfer, Shinkansen to Nagano (Sat 16 Jan 2027), ≥20-min change (official advice), Nagaden express Nagano→Ichinose Village 90–100 min (winter 2026-27 timetable). Median of 5 efficient itineraries 245–291 min. checked 2026-10-02

Calculation. 266 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h 55. The wait for the first departure after the allowance is not included.

Confidence in the journey time: medium. A model with assumed changes (about 30 minutes from Haneda to Tokyo Station plus 10, at least 20 at Nagano, as the national park advises).

From Narita (NRT). About 30 minutes longer: the fastest Narita Express to Tokyo Station takes 53 minutes (JR East, checked 3 October 2026), against about 30 minutes from Haneda.

Silvretta Montafon · 2 h 40 from Zurich (ZRH) · medium confidence · checked 2 October 2026

Basis. median of 2 operator-stated figures: Ziptransfers 2h15 (135); 3Valley ~2h (120) = 127.5

Calculation. 128 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 40.

Confidence in the journey time: medium. Two published figures.

Ski Arlberg · 2 h 05 from Innsbruck (INN) · high confidence · checked 3 October 2026

Basis. Median of 7 published typical INN → Lech figures: official Lech Zürs 1h30–1h50 (midpoint 1h40), Taxi Innsbruck Airport 1h40, Hoppa 1h35, AlpinBus 1h35, MyTransfers 1h33, Ski-Lifts 1h30, Alps2Alps 'just over 2 hours' → 1h35.

Calculation. 95 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 05.

Confidence in the journey time: high. Seven published figures, six of them within 10 minutes of each other.

SkiBig3 · 2 h 15 from Calgary (YYC) · medium confidence · checked 2 October 2026

Basis. Median of 90 (SkiBig3 official: easy 90-minute drive; Banff & Lake Louise Tourism says the same and is counted once with it), 90 (AMPM Limo private charter: approximately 90 min), 120 (Brewster Express winter 2026/27 timetable: 7 of 8 Calgary-Banff runs take 2:00) and 120 (Banff Airporter: typically 2 hours).

Calculation. 105 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 15.

Confidence in the journey time: medium. The median is 90 or 105 minutes depending on whether two official pages count as one source or two.

Skicircus Saalbach Hinterglemm Leogang Fieberbrunn · 2 h from Salzburg (SZG) · high confidence · checked 3 October 2026

Basis. median of three operators' typical Salzburg Airport→Saalbach times: Ski-Lifts 1h30 (90), Alps2Alps 1h30 (90), Alpinbus 1h28 (88) → 90; the resort's official arrival page gives 90 km (56 miles)

Calculation. 90 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h.

Confidence in the journey time: high. Three published figures, all within 2 minutes of each other.

Skirama Dolomiti Adamello Brenta · 4 h from Milan (MXP) · high confidence · checked 2 October 2026

Basis. Median of 3 operators' typical MXP→Madonna di Campiglio times: TransferMe24 3h25, Alps2Alps 3h30, Taxi Pinzolo Campiglio 3h40 → 210 min.

Calculation. 210 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 4 h.

Confidence in the journey time: high. Three published figures, all within 15 minutes of each other.

SkiWelt Wilder Kaiser–Brixental · 1 h 35 from Innsbruck (INN) · high confidence · checked 2 October 2026

Basis. median of 5 published typical figures (60, 60, 65, 68, 75 min: official wilderkaiser.info 60; Ski-Lifts 60; Taxi Innsbruck Airport 65; AlpinBus 68; Shuttle Direct 75); Holiday Taxis lists Söll (90 min), not Ellmau; Hoppa's Ellmau page gives no time; one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 65 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 35.

Confidence in the journey time: high. Five published figures, four of them within 8 minutes of each other.

Sölden · 1 h 45 from Innsbruck (INN) · high confidence · checked 2 October 2026

Basis. median of 8 published typical figures (70, 70, 71, 75, 75, 75, 84, 110 min: Taxi Innsbruck Airport 70; Airport Taxi Tirol (midpoint of 65–75) 70; AlpinBus 71; official soelden.com 75; Alps2Alps 75; Ski-Lifts 75; Shuttle Direct 84; Holiday Taxis 110); one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 75 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 45.

Confidence in the journey time: high. Eight published figures, seven of them within 14 minutes of each other.

Steamboat · 1 h 05 from Yampa Valley / Hayden (HDN) · high confidence · checked 2 October 2026

Basis. Median of 35 (Steamboat Chamber, official tourist office: midpoint of its 30-40 min transfer), 30 (Yampa Valley Regional Airport: '30 minute or less') and 40 (Ski Town Transportation: about 40 min).

Calculation. 35 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 05.

Confidence in the journey time: high. Three published figures, all within 10 minutes of each other.

Tignes–Val d'Isère · 3 h 30 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Val d'Isère official 3h, Ski-Lifts approx. 3h, Alpybus 2h55, Mountain Drop-offs approx. 3h15, Alps2Alps approx. 3h30 → 3h00

Calculation. 180 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h 30.

Confidence in the journey time: high. Five published figures, four of them within 20 minutes of each other.

Tremblant · 2 h 15 from Montreal-Trudeau (YUL) · high confidence · checked 2 October 2026

Basis. median of 5 published typical figures: Tremblant official '90 minutes' (90); official YUL shuttle timetable 9:30->11:30 to first village stop (120); Hoppa 1h30-2h (105); Ridebooker 1.5-2h (105); Welcome Pickups ~1h20 (80)

Calculation. 105 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 15.

Confidence in the journey time: high. Five published figures, four of them within 25 minutes of each other.

Trysil · 2 h 55 from Oslo (OSL) · medium confidence · checked 2 October 2026

Basis. Median of 6 published typical OSL→Trysil times: MyTransfers 1h58, Ski-Lifts 2h00, JamTransfer 2h24, Hoppa 2h30, Alps2Alps 2h45 (midpoint of 2.5–3 h), Trysilekspressen bus 3h00 (the official site says 'just under three hours'; counted once) → 147 min.

Calculation. 147 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 55.

Confidence in the journey time: medium. Six published figures, spread over 47 minutes even with one set aside.

Vail · 1 h 20 from Eagle County (EGE) · high confidence · checked 3 October 2026

Basis. Median of published typical EGE→Vail transfers: Epic Mountain Express shared ~50 min, Blue Sky Limo private ~40 min, Blue Sky Limo shared 40–60 min (midpoint 50) → 50. EME's generic 'just 30 minutes from Vail and Beaver Creek' not used (EME's own route figure is 50). checked 2026-10-02

Calculation. 50 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 20.

Confidence in the journey time: high. Three published figures, all within 10 minutes of each other.

Valmorel – Grand Domaine · 2 h 35 from Geneva (GVA) · high confidence · checked 2 October 2026

Basis. median of 4 figures: Valmorel official 2h drive (120); Ski-Lifts ~2h (120); Alps2Alps 2h10 (130); 3Valley 2h-2h30 (135) = 125

Calculation. 125 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 35.

Confidence in the journey time: high. Four published figures, all within 15 minutes of each other.

Verbier 4 Vallées · 2 h 30 from Geneva (GVA) · high confidence · checked 3 October 2026

Basis. median of Verbier official 'allow around 1h50', Alps2Alps 1h55, Mountain Drop-offs approx. 2h00, Alpybus 2h10, Ski-Lifts 2–2.5 h (mid 2h15) → 2h00

Calculation. 120 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h 30.

Confidence in the journey time: high. Five published figures, four of them within 20 minutes of each other.

Via Lattea · 2 h from Turin (TRN) · high confidence · checked 3 October 2026

Basis. median of four operators' typical Turin Airport→Sestriere times: Alps2Alps 1h30 (90), Ski-Lifts 1h30 (90), Mountain Ski Transfer 1h30 (90), Hoppa 1h45 (105) → 90

Calculation. 90 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 2 h.

Confidence in the journey time: high. Four published figures, all within 15 minutes of each other.

Whistler Blackcomb · 3 h from Vancouver (YVR) · medium confidence · checked 2 October 2026

Basis. Median of airport-specific figures: 120 (Tourism Whistler: 2 hours from YVR), 150 (Whistler Shuttle: around 2.5 h), 180 (YVR Skylynx standard timetable: YVR 7:00 to Whistler Village 10:00; 5 of 7 daily runs) and 150 (Fairmont Chateau Whistler sedan guide: 2.5 h). Median stays 150 if Tourism Whistler's shuttle-bus figure (2.5-3 h) or Star Chauffeured's generic Vancouver figure (90 min-2 h) is added.

Calculation. 150 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 3 h.

Confidence in the journey time: medium. Four published figures, spread over 60 minutes.

Zell am See–Kaprun · 1 h 55 from Salzburg (SZG) · high confidence · checked 3 October 2026

Basis. median of three operators' typical Salzburg Airport→Zell am See times: Ski-Lifts 1h15–1h30 (82.5), Alps2Alps 1h15 (75), Alpinbus 1h23 (83) → 82.5

Calculation. 82½ minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 55.

Confidence in the journey time: high. Three published figures, all within 8 minutes of each other.

Zillertal · 1 h 35 from Innsbruck (INN) · high confidence · checked 2 October 2026

Basis. median of 8 published typical figures (60, 60, 64, 65, 67.5, 69, 75, 120 min: Alps2Alps 60; SIXT ride 60; AlpinBus 64; Taxi Innsbruck Airport 65; Hoppa (midpoint of 1h–1h15) 67.5; Shuttle Direct 69; Ski-Lifts 75; Holiday Taxis 120); official mayrhofen.at gives distances only; one figure per operator (its route page; ranges -> midpoint); Alps2Alps only where it has a route page; journey planners, ski guides, forums and where-to-ski.com excluded

Calculation. 66 minutes of journey (the median of the figures below), plus the 30-minute landing allowance, rounded to five minutes: 1 h 35.

Confidence in the journey time: high. Eight published figures, seven of them within 15 minutes of each other.